01 The standard
The quality bar we build and operate to.
Every clause keeps its number for good, so a quotation still points at the thing it quoted.
Clear height
21 m
under haunch where VNA is specified
Slab
Superflat
defined movement in the VNA aisles
Zones
All three
free zone, mainland, port estate
02 Part 1 · Project criteria
What a site has to be before we build on it.
| Clause | Parameter | What we require |
|---|---|---|
| 1.01 | Coverage and phasing | Building, yard and apron fit on the plot with land left for a second phase. |
| 1.02 | Plot area | 20,000–50,000 m² (215,000–540,000 sq ft) of land. This is the plot we develop on, not the building that stands on it. |
| 1.05 | Tenure | Freehold, or a lease long enough to amortise the building, on lendable title. |
| 1.06 | Zone | Free zone, mainland or port estate. The zone decides where duty falls due. |
| 1.08 | Clear height | 18 m minimum under haunch, 21 m where VNA is specified, inside the plot’s planning limit. |
| 1.09 | Slab capacity | Rated for the racking’s uniformly distributed load, with baseplate point loads specified separately. |
| 1.11 | Services at the boundary | Supply and substation space for temperature control and an electric fleet, plus fire water storage. |
The first plot taken through Part 1 is in JAFZA, and the building going up on it is 144,000 sq ft: 21 m clear for VNA racking, bonded, ready March 2027.
Clause 1.06 — the zone changes the duty, not the building.
| Zone | Duty |
|---|---|
| Free zone | Suspended inside the perimeter. A re-export leaves still suspended; a mainland sale is an import. |
| Mainland | Cleared on arrival and held duty-paid, so distribution is a delivery, not a clearance. |
| Port estate | Suspended inside the port’s customs boundary, with quay and shed inside it. |
Part 1, as a tool you can run yourself.
The test reads a plot against the Part 1 clauses above. It needs JavaScript.
03 Part 2 · Construction
A Grade A unit, and the pallet positions inside it.
The second drawing fills a wide-aisle shed and a very narrow aisle high bay on one footprint.
Conventional wide aisle
3.8 m aisle · conventional clear height
A counterbalance truck turns inside the aisle, so the aisle has to be wide enough to turn in. Block plus aisle is a 6.2 m pitch: four blocks — eight runs — fill the depth drawn.
Very narrow aisle high bay
1.7 m aisle · 21 m clear
The VNA truck does not turn, so the aisle only has to be wide enough to pass. The pitch falls to 4.1 m: six blocks — twelve runs — fill the same depth, and the racking keeps going up.
+35–50% pallet positions on the same footprint
04 Part 2, in full
The building, specified so it can be measured.
TR34, DIN 15185 and FM2 are external standards, so a surveyor certifies the finished work rather than approving of it.
| Clause | Parameter | Specified |
|---|---|---|
| 2.01 | Clear height | Measured under the haunch, not to the ridge: 21 m (69 ft) with VNA racking. |
| 2.05 | Slab and tolerance | Defined-movement superflat to TR34 Class 1 and DIN 15185 in the VNA aisles, FM2 elsewhere. |
| 2.07 | Conditions | Ambient and temperature-controlled as separately insulated envelopes, each with its own floor build-up. |
| 2.11 | Fire | ESFR selected by commodity class and rack configuration, with in-rack heads where storage height requires them. |
| 2.14 | Handover | Floor tolerance certified before racking is installed; racking load-tested, sprinklers witness-tested, envelopes soak-tested. |
05 Part 3 · How a warehouse runs
Four stages over one continuous record.
- 01Gate in
- 02Addressed storage
- 03Value added
- 04Dispatch
Warehouse management system
06 Part 3, in full
Three rules the scan enforces.
| Clause | Rule | What the system enforces |
|---|---|---|
| 3.04 | Addressing | Every rack position and staging lane carries one address: aisle, bay, level, position. |
| 3.05 | Put away | The location is assigned against velocity and temperature class, and the operator scans it to confirm. |
| 3.07 | Rotation | FIFO where age is the only concern, FEFO wherever the product carries an expiry date. |
07 Part 4 · Control
What the operation can show afterwards.
| Clause | Control | The form it takes |
|---|---|---|
| 4.02 | Anti-error barcode control | Item and location are both scanned wherever custody changes, and the move is held until the scan matches. |
| 4.03 | Dual quality control | An independent second check against the order before an outbound load closes, recorded with operator and time. |
| 4.06 | Dangerous goods provision | A segregated compartment, separately bunded and drained, with its own detection and access control. The license sets what a site may hold. |
| 4.10 | Records and audit | Retention set before the first receipt. Client stock data belongs to the client, and the operation is open to audit. |
Clause 4.03 holds cell accuracy at 99% on the network our operating partner RFL runs in the CIS, where it has more than 3,000,000 sq ft under management. The UAE operation is held to the same clauses from the first receipt.
08 Next
Land goes to Part 1. Cargo goes to Parts 3 and 4.
We own and operate what we build, so this is the document we ask to be held to.